- Met at the space with owner & architect
- Weighed options on no entry door from corridor and no windows in bedroom
- Agreed to move forward with current plan
- Visited IKEA to look at cabinet options
4.29.2009
Design Development 2.0 (4.17.09)
Financing Strategy 3.0 (4.16.09)
- Decided construction loan would be mine with securitization by existing owner
- Once BB&T has required financials an appraisal will be initiated
- Max LTV of 80% of completed value for construction loan
Design Development 1.0 (4.8.09)
- Reviewed progression of design
- Main outstanding issue is articulation of 'the wall'
Reengaged Attorney (4.8.09)
- asked attorney to get re-amendment of docs into their work flow
- reviewed what the intention of new changes
COA Board Meeting (4.7.09)
- Compromised on patio rail location allowing for privacy of resident and standing room at entrance for visitors
- Agreed cleanest way to handle doc amendments is to strike commercial use all together
- discussed possible alternatives for the garage exhaust fan
Reengage Contractor 'A' (4.1.09)
- Reached out to general contractor that had previously looked at the space
- Once design is finalized they will re-estimate cost
- Sent original estimate for reference
Schematic Design 2.0 (4.1.09)
- Converged on a single scheme
- Discussed pros/cons of eliminating hall door
Financing Strategy 2.0 (3.29.09)
- Discussed securing the loan with the shell alone
- No non recourse loans by BB&T... need personal guarantee
Partnership Meeting (3.27.09)
- Contemplated pros/cons of 'open' 1/1 floor plan
- Discussed securing financing with shell as colateral rather than guarantees
- Reviewed comp research and resulting tweaks to pro forma
- Decided to move forward with adjusting condo docs to limit future use of space to residential
4.28.2009
Schematic Design 1.0 (3.25.09)
- Met with Architect to review round one of schematics
- Discussed 1 bed / 1 bath scenario vs 1 bed / 1.5 bath w/ den
- Decided nature of space along with patio dictated creating a place to entertain
- Planned to pursue and open 'loft like' floor plan
Financing Strategy 1.0 (3.24.09)
- Contacted BB&T regarding financing up-fit
- Received required documentation and discussed LTV scenarios
Architect Brought Onboard (3.17.09)
- Met at space with architect of choice
- Discussed vision for the space before
- Agreed to work on design together
COA Reengaged (3.16.09)
- Need to legally convert the space from commercial use to residential use
- Contacted property manager regarding amendment of Condo Declaration and Bylaws
Partnership Confirmed (3.13.09)
- Presented pro forma analysis, of conversion and sale of unit, to existing owner
- Based on financial model a partnership was formed
- Existing owner as equity/land partner and myself as developer.